News Center

The first phase of the project has been completed with an annual production capacity of 10,000 tonnes of continuous glass fibre thermoplastic prepreg belts.


Release time:

2019-01-14

The first phase of the project has been completed with an annual output of 10,000 tonnes of continuous glass fibre thermoplastic prepreg tape and an annual output of 8 million square metres of thermoplastic composite sheet production capacity, the project products, by virtue of their excellent performance, can be a substitute for metal sheets, thermosetting composite materials applications, has been comprehensively entered into the field of rail transit, aviation, new energy vehicles.

The first phase of the project has been completed with an annual output of 10,000 tonnes of continuous glass fibre thermoplastic prepreg tape and an annual output of 8 million square metres of thermoplastic composite sheet production capacity, the project products, by virtue of their excellent performance, can be a substitute for metal sheets, thermosetting composite materials applications, has been comprehensively entered into the field of rail transit, aviation, new energy vehicles.